34.1 Ignition fault during ignition trials

High severity 59SC6A

What the control is telling you

Flame was not proven during the four consecutive ignition trials.

Applies to: Carrier 59SC6A

Likely causes

  • Low gas pressure or gas off
  • Weak/failed igniter
  • Dirty flame sensor
  • Gas valve not opening
  • Poor ground

Test and repair steps

  1. Warning: If you smell gas, shut off the gas and fix the leak before any ignition attempt.
  2. Know the sequence inducer starts, LPS closes, 15-s prepurge, 17-s igniter warm-up, gas valve opens, then a 2-s flame-proving window starts 5 s after the valve opens. Failure to prove flame repeats for up to 3 more trials (4 total), then lockout.
  3. Confirm the manual gas shutoff is open and natural gas supply pressure is 4.5-14 in. w.c.
  4. Watch a trial does the HSI glow? Check HSI cold resistance across both leads at room temperature: 40-70 ohms. Replace if out of range or damaged.
  5. Does the gas valve open (24 VAC at valve) and burners light? If no gas with 24 VAC present, suspect the valve; check manifold pressure (2.8-3.8 in. w.c. natural gas for 40k-120k models; max 1.8 in. w.c. on 26k model).
  6. If burners light then go out within ~2 s, clean the flame sensor with 0000 steel wool only (no sandpaper or emery cloth) and check its position.
  7. Verify ground the control proves flame through the green/yellow ground to the gas valve and manifold bracket; the flame-sense ground wire must be attached to furnace sheet metal.
  8. Check igniter alignment and orifices for blockage.
  9. The control retries automatically; four failed trials in a row gives 14.1 lockout.

Settings for these units

Filter sizes by casing width and filter cabinet · 59SC6A

LocationSizeSide return filterBottom return filterType
Furnace casing14-3/16 in. wide16 x 25 x 3/4 in.14 x 25 x 3/4 in.Washable
Furnace casing17-1/2 in. wide(1) 16 x 25 x 3/4 in.(1) 16 x 25 x 3/4 in.Washable
Furnace casing21 in. wide(1) 16 x 25 x 3/4 in.(1) 20 x 25 x 3/4 in.Washable
Furnace casing24-1/2 in. wide(1) 16 x 25 x 3/4 in.(1) 24 x 25 x 3/4 in.Washable
Filter cabinet16 in. high(1) 16 x 25 x 3/4 in. or (1) 16 x 25 x 4-5/16 in.-Washable or media
Filter cabinet20 in. high(1) 20 x 25 x 3/4 in. or (1) 20 x 25 x 4-5/16 in.-Washable or media
Filter cabinet24 in. high(1) 24 x 25 x 3/4 in. or (1) 24 x 25 x 4-5/16 in.-Washable or media

Side-return filters can differ in size - measure the existing filter.

Every return-air inlet needs a filter.

Minimum clearances to combustibles · 59SC6A

PositionMinimum clearance
Rear0
Front (combustion air openings in furnace and in structure)1 in. (25 mm)
Required for service24 in. (610 mm) (see note)
All sides of supply plenum1 in. (25 mm) (see note)
Sides0
Vent0
Top of furnace1 in. (25 mm)

Service and supply-plenum values are marked 'consult local building codes'.

Keep 1 in. (25 mm) from combustibles to supply ductwork for 36 in. (914 mm) horizontally from the furnace.

Models that show this code

11 models in 59SC6A

59SC6A026M14--1059SC6A040M14--1059SC6A040M17--1259SC6A060M14--1259SC6A060M17--1659SC6A080M17--1659SC6A080M21--2059SC6A100M21--2059SC6A100M21--2259SC6A120M24--2259SC6A140M24--22

Other codes on the same units

  • 31.2 Secondary pressure switch (HPS) open
  • 31.3 Secondary pressure switch lockout
  • 32.1 Main pressure switch (LPS) open
  • 33.1 Main limit circuit switch open
  • 34.2 Flame lost before blower on-delay
  • 34.3 Flame lost after blower on-delay
  • 45.1 Control failure - flame circuit / memory / sequence
  • 45.2 Control failure - gas valve relay will not close

Save it for the next call

Star this code in the HVACopedia app and keep the whole library on your phone for jobs with no signal.

Open the app

Source: Carrier 59SC6A Installation, Start-up, Operating and Service Instructions, Fig. 60 Service Label p.54; Fig. 61 wiring notes p.56; Burner/Igniter service p.66-67; Sequence of Operation p.68-69. Summarized in our own words; check the original manual for your model.

Homeowner looking at this code? See what it means for you and when to call a technician.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.